Express 3 Hour Delivery
Express 5 Hour Delivery
Express Next Day Delivery
Courier Delivery
Collect From Warehouse
FREE POWERPAC FLEECE! on online orders over $4000
FREE POWERPAC FLEECE! on online orders over $4000

Formatube 3.0m x 508mm dia

SKU: 619-FT500X3

$390.00 + GST

Formatube offers a comprehensive solution for creating flawless concrete columns with ease. Crafted with precision, these wax-lined cardboard tubes are engineered to simplify the column forming process while ensuring exceptional results. 

Applications:
  • Perfect for constructing columns in residential and commercial buildings, as well as other structures.
  • Effective for developing footings and piers.
  • Suitable for round void-forming in cast-in-place and pre-cast concrete, used in roof slabs, bridge decks, and beams.
  • Streamlines the formation of round concrete columns and foundations.
  • Provides strong support for pier holes, ensuring stability in softer ground conditions.
Key Advantages:
  • Effortless Handling: Lightweight design for easy maneuverability.
  • Efficient Stripping: Oil lining facilitates smooth and hassle-free removal.
  • Exceptional Finish: Opt for our optional plastic lining for an impeccably smooth surface.
  • Cost-Effective: Streamline your projects without breaking the bank.
  • Water-Resistant: Outer lining ensures durability even in challenging conditions.
  • Eco-Friendly: Made from biodegradable materials, aligning with sustainable practices.
Placing:
  • Convenient and simple to manage.
  • Customizable on-site by cutting to desired length.
  • Installation requires no bolting, nailing, or piercing.
  • Easily placed over reinforcing bar cages.
  • Multiple forms can be prepared for simultaneous pouring.
Bracing:
  • Achieving plumb alignment is straightforward with minimal bracing.
  • Light timber or existing scaffolding can maintain form alignment during pouring.
  • For tubes up to 225 mm in diameter, brace every 2.5 meters.
  • For tubes 250 mm in diameter and larger, brace every 3 meters.
Pouring:

Formatube forms allow for a single lift pour using standard methods, with a recommended rate of no more than 4.5 meters per hour and pressure below 14 Kpa. While a release agent is optional for Formatube forms, it's advisable for harsh concrete mixes.

Curing:

Leaving Formatube forms in place enhances moisture retention, reducing seepage, absorption, and evaporation for optimal cement hydration and curing.

Stripping:

Quick and effortless, typically recommended 1-5 days post-pouring. Stripping methods include:

  • Two vertical cuts along the column using a power saw, then removing the form.
  • A 30-cm vertical cut with a linoleum knife, followed by spirally peeling using a broad-blade tool.
Read more
In Stock

Need a quote? Simply add to cart and you have the option to request a quote before checkout

Categories:

What is Formatube 3.0m x 508mm dia?

Formatube offers a comprehensive solution for creating flawless concrete columns with ease. Crafted with precision, these wax-lined cardboard tubes are engineered to simplify the column forming process while ensuring exceptional results. 

Applications:
  • Perfect for constructing columns in residential and commercial buildings, as well as other structures.
  • Effective for developing footings and piers.
  • Suitable for round void-forming in cast-in-place and pre-cast concrete, used in roof slabs, bridge decks, and beams.
  • Streamlines the formation of round concrete columns and foundations.
  • Provides strong support for pier holes, ensuring stability in softer ground conditions.
Key Advantages:
  • Effortless Handling: Lightweight design for easy maneuverability.
  • Efficient Stripping: Oil lining facilitates smooth and hassle-free removal.
  • Exceptional Finish: Opt for our optional plastic lining for an impeccably smooth surface.
  • Cost-Effective: Streamline your projects without breaking the bank.
  • Water-Resistant: Outer lining ensures durability even in challenging conditions.
  • Eco-Friendly: Made from biodegradable materials, aligning with sustainable practices.
Placing:
  • Convenient and simple to manage.
  • Customizable on-site by cutting to desired length.
  • Installation requires no bolting, nailing, or piercing.
  • Easily placed over reinforcing bar cages.
  • Multiple forms can be prepared for simultaneous pouring.
Bracing:
  • Achieving plumb alignment is straightforward with minimal bracing.
  • Light timber or existing scaffolding can maintain form alignment during pouring.
  • For tubes up to 225 mm in diameter, brace every 2.5 meters.
  • For tubes 250 mm in diameter and larger, brace every 3 meters.
Pouring:

Formatube forms allow for a single lift pour using standard methods, with a recommended rate of no more than 4.5 meters per hour and pressure below 14 Kpa. While a release agent is optional for Formatube forms, it’s advisable for harsh concrete mixes.

Curing:

Leaving Formatube forms in place enhances moisture retention, reducing seepage, absorption, and evaporation for optimal cement hydration and curing.

Stripping:

Quick and effortless, typically recommended 1-5 days post-pouring. Stripping methods include:

  • Two vertical cuts along the column using a power saw, then removing the form.
  • A 30-cm vertical cut with a linoleum knife, followed by spirally peeling using a broad-blade tool.

Technical Specifications

No specifications available for this product.

Resources

Download your Formatube 3.0m x 508mm dia resources:

PowerPac Expert

Need an Expert?

We're here to help you with any questions you have on Formatube 3.0m x 508mm dia.

Join our newsletter and get 20% discount
Promotion nulla vitae elit libero a pharetra augue