• Site Setup
          • Concrete Construction
            Site Setup
            SITE
            SETUP
    • Building &
      Construction
          • Concrete Construction
            Building & Construction
            BUILDING &
            CONSTRUCTION
    • Concrete
      Construction
          • Concrete Construction
            Concrete Construction
            CONCRETE
            CONSTRUCTION
    • Formwork
          • Concrete Construction
            Formwork
            FORMWORK
    • Crane
      Attachments
          • Concrete Construction
            Crane Attachments
            CRANE
            ATTACHMENTS
    • Environmental
      Civil Supplies
          • Concrete Construction
            Environmental Civil Supplies
            ENVIRONMENTAL
            CIVIL SUPPLIES
    • Plant &
      Equipment
          • Concrete Construction
            Plant & Equipment
            PLANT &
            EQUIPMENT
    • Safety &
      Security
          • Concrete Construction
            Safety & Security
            SAFETY &
            SECURITY
    • Site
      Signage
          • Concrete Construction
            Safety & Security
            SITE
            SIGNAGE
  • Concrete Formwork Solutions
  • Construction & Interior Solutions
  • Branding & Signage Solutions
  • Latest Deals
  • Contact Us
Express 3 Hour Delivery
Express 5 Hour Delivery
Express Next Day Delivery
Courier Delivery
Collect From Warehouse

Forma Tube 3.0m x 457 dia

$290.00 excl GST

Formatube is a lightweight and cost-effective fibre form designed to provide a fast, versatile method for pouring concrete columns and round voids. They promise easy handling and rapid setup without the fuss of cleaning or heavy lifting.  

Design
  • Lightweight Cardboard, specifically designed to provide a fast, versatile method of pouring concrete columns and structural members.
  • A one-time use form — there’s no cleaning, no oiling,   and no form inventory required.
  • F3-Grade Finish
Downloads
SKU 619-FT450X3 Category

Description

Formatube offers a comprehensive solution for creating flawless concrete columns with ease. Crafted with precision, these wax-lined cardboard tubes are engineered to simplify the column forming process while ensuring exceptional results. 

Applications:
  • Perfect for constructing columns in residential and commercial buildings, as well as other structures.
  • Effective for developing footings and piers.
  • Suitable for round void-forming in cast-in-place and pre-cast concrete, used in roof slabs, bridge decks, and beams.
  • Streamlines the formation of round concrete columns and foundations.
  • Provides strong support for pier holes, ensuring stability in softer ground conditions.
Key Advantages:
  • Effortless Handling: Lightweight design for easy maneuverability.
  • Efficient Stripping: Oil lining facilitates smooth and hassle-free removal.
  • Exceptional Finish: Opt for our optional plastic lining for an impeccably smooth surface.
  • Cost-Effective: Streamline your projects without breaking the bank.
  • Water-Resistant: Outer lining ensures durability even in challenging conditions.
  • Eco-Friendly: Made from biodegradable materials, aligning with sustainable practices.
Placing:
  • Convenient and simple to manage.
  • Customizable on-site by cutting to desired length.
  • Installation requires no bolting, nailing, or piercing.
  • Easily placed over reinforcing bar cages.
  • Multiple forms can be prepared for simultaneous pouring.
Bracing:
  • Achieving plumb alignment is straightforward with minimal bracing.
  • Light timber or existing scaffolding can maintain form alignment during pouring.
  • For tubes up to 225 mm in diameter, brace every 2.5 meters.
  • For tubes 250 mm in diameter and larger, brace every 3 meters.
Pouring:

Formatube forms allow for a single lift pour using standard methods, with a recommended rate of no more than 4.5 meters per hour and pressure below 14 Kpa. While a release agent is optional for Formatube forms, it’s advisable for harsh concrete mixes.

Curing:

Leaving Formatube forms in place enhances moisture retention, reducing seepage, absorption, and evaporation for optimal cement hydration and curing.

Stripping:

Quick and effortless, typically recommended 1-5 days post-pouring. Stripping methods include:

  • Two vertical cuts along the column using a power saw, then removing the form.
  • A 30-cm vertical cut with a linoleum knife, followed by spirally peeling using a broad-blade tool.

Reviews

There are no reviews yet.

Only logged in customers who have purchased this product may leave a review.

Join our newsletter and get 20% discount
Promotion nulla vitae elit libero a pharetra augue