Description
Formatube offers a comprehensive solution for creating flawless concrete columns with ease. Crafted with precision, these wax-lined cardboard tubes are engineered to simplify the column forming process while ensuring exceptional results.
Applications:
- Perfect for constructing columns in residential and commercial buildings, as well as other structures.
- Effective for developing footings and piers.
- Suitable for round void-forming in cast-in-place and pre-cast concrete, used in roof slabs, bridge decks, and beams.
- Streamlines the formation of round concrete columns and foundations.
- Provides strong support for pier holes, ensuring stability in softer ground conditions.
Key Advantages:
- Effortless Handling: Lightweight design for easy maneuverability.
- Efficient Stripping: Oil lining facilitates smooth and hassle-free removal.
- Exceptional Finish: Opt for our optional plastic lining for an impeccably smooth surface.
- Cost-Effective: Streamline your projects without breaking the bank.
- Water-Resistant: Outer lining ensures durability even in challenging conditions.
- Eco-Friendly: Made from biodegradable materials, aligning with sustainable practices.
Placing:
- Convenient and simple to manage.
- Customizable on-site by cutting to desired length.
- Installation requires no bolting, nailing, or piercing.
- Easily placed over reinforcing bar cages.
- Multiple forms can be prepared for simultaneous pouring.
Bracing:
- Achieving plumb alignment is straightforward with minimal bracing.
- Light timber or existing scaffolding can maintain form alignment during pouring.
- For tubes up to 225 mm in diameter, brace every 2.5 meters.
- For tubes 250 mm in diameter and larger, brace every 3 meters.
Pouring:
Formatube forms allow for a single lift pour using standard methods, with a recommended rate of no more than 4.5 meters per hour and pressure below 14 Kpa. While a release agent is optional for Formatube forms, it’s advisable for harsh concrete mixes.
Curing:
Leaving Formatube forms in place enhances moisture retention, reducing seepage, absorption, and evaporation for optimal cement hydration and curing.
Stripping:
Quick and effortless, typically recommended 1-5 days post-pouring. Stripping methods include:
- Two vertical cuts along the column using a power saw, then removing the form.
- A 30-cm vertical cut with a linoleum knife, followed by spirally peeling using a broad-blade tool.
Reviews
There are no reviews yet.