Express 3 Hour Delivery
Express 5 Hour Delivery
Express Next Day Delivery
Courier Delivery
Collect From Warehouse

Site Safety Management Board with Risk Matrix 2400mm x 1200mm

SKU: 690-SMB2412RM

$563.00 + GST

Site Safety Management Board with Risk Matrix gives your site a structured way to assess and track hazards using a full risk assessment matrix. A simple hazard list tells people what's dangerous, but it doesn't help them work out how serious a risk actually is or what action it needs. This board includes a structured risk table covering what can cause harm, risk ratings before and after controls, and a full Likelihood x Consequences risk assessment matrix with defined action requirements for each risk level. Made from durable ACM (aluminium composite panel), it holds up outdoors for the length of a project. Sized at 2400mm x 1200mm, it's built for sites that need a formal, documented approach to risk assessment. Site managers and safety officers use it to record, rate and track hazards against a consistent risk framework.

Read more

Key Specs

  • Size: 2400mm x 1200mm
  • Material: ACM (Aluminium Composite Panel)
  • Customisation: Full custom content including site name, contacts and hazard entries
See All Specifications
Out of Stock

Need a quote? Simply add to cart and you have the option to request a quote before checkout

What is Site Safety Management Board with Risk Matrix?

Site Safety Management Board with Risk Matrix gives your site a structured way to assess and track hazards using a full risk assessment matrix. A simple hazard list tells people what’s dangerous, but it doesn’t help them work out how serious a risk actually is or what action it needs. This board includes a structured risk table covering what can cause harm, risk ratings before and after controls, and a full Likelihood x Consequences risk assessment matrix with defined action requirements for each risk level. Made from durable ACM (aluminium composite panel), it holds up outdoors for the length of a project. Sized at 2400mm x 1200mm, it’s built for sites that need a formal, documented approach to risk assessment. Site managers and safety officers use it to record, rate and track hazards against a consistent risk framework.

Benefits

  • Full Likelihood x Consequences risk matrix for structured hazard assessment
  • Tracks risk ratings before and after controls are applied
  • Defines clear action requirements for each residual risk level
  • Gives a consistent, documented framework for rating hazards
  • Custom-printed with your site name and safety contacts
  • Durable ACM panel holds up outdoors without fading or warping

Main Applications

  • Formal risk assessment and hazard tracking on larger sites
  • Sites requiring a documented, structured safety framework
  • Recording risk ratings before and after controls
  • Reference board for site inductions and safety briefings
  • Sites where a simple hazard list isn't sufficient

Technical Specifications

Specification Details
Size 2400mm x 1200mm
Material ACM (Aluminium Composite Panel)
Customisation Full custom content including site name, contacts and hazard entries

Resources

Download your Site Safety Management Board with Risk Matrix resources:

  • Safety Data Sheet

    Site Safety Management Board with Risk Matrix does not have any Safety Data Sheets. Request here

PowerPac Expert

Need an Expert?

We're here to help you with any questions you have on Site Safety Management Board with Risk Matrix.

Frequently Asked Questions

About Site Safety Management Board with Risk Matrix

Join our newsletter and get 20% discount
Promotion nulla vitae elit libero a pharetra augue