SKU: 690-PPB4WK2412
4 Week Planner Board tracks safety, quality, stakeholder and construction activities across a rolling four-week programme. A shorter planner runs out of room fast on a longer job, and tracking safety and quality alongside construction progress on separate documents means issues get missed. This board covers safety, quality, stakeholder and traffic tracking, up to six construction activity lines, and space for other and parked issues, all set against four weekly columns. Made from durable ACM (aluminium composite panel), it holds up to daily use in a site office. Sized at 2800mm x 1500mm, it's built for larger sites needing a longer planning horizon than a single week or month view. Site managers use it to track performance and progress across a rolling four-week window.
Need a quote? Simply add to cart and you have the option to request a quote before checkout
4 Week Planner Board tracks safety, quality, stakeholder and construction activities across a rolling four-week programme. A shorter planner runs out of room fast on a longer job, and tracking safety and quality alongside construction progress on separate documents means issues get missed. This board covers safety, quality, stakeholder and traffic tracking, up to six construction activity lines, and space for other and parked issues, all set against four weekly columns. Made from durable ACM (aluminium composite panel), it holds up to daily use in a site office. Sized at 2800mm x 1500mm, it’s built for larger sites needing a longer planning horizon than a single week or month view. Site managers use it to track performance and progress across a rolling four-week window.
| Specification | Details |
|---|---|
| Size | 2800mm x 1500mm |
| Material | ACM (Aluminium Composite Panel) |
| Customisation | Full custom layout including logo and activity categories |
Download your 4 Week Planner Board resources:
4 Week Planner Board does not have any Safety Data Sheets. Request here
About 4 Week Planner Board
Safety, quality, stakeholder and traffic tracking, up to six construction activity lines, and space for other and parked issues, set against four weekly columns.
2800mm x 1500mm.
ACM (aluminium composite panel), a durable material suited to daily use in a site office.
[info needed] on whether the printed board includes a write-on laminate finish for weekly updates, or whether it's a printed reference only — confirm the finish when ordering.
This board tracks safety, quality, stakeholder and construction activities over four weeks. The 3 Week Planner is built specifically around shipping and tide scheduling for marine or coastal work.