Express 3 Hour Delivery
Express 5 Hour Delivery
Express Next Day Delivery
Courier Delivery
Collect From Warehouse

Formwork LVL 150 x 77 5.8m

SKU: 6196-LVL1507760

$149.00 + GST

LVL Formwork Timber 150mm x 77mm x 5.8m is a structural laminated veneer lumber beam built for bearers, joists, walers, and soldiers in concrete formwork. Standard sawn timber can bow or twist along its length, and strength can vary from one length to the next, which shows up as an uneven concrete finish once the formwork comes off.

Laminated veneer construction solves this. Thin timber veneers are bonded into a single 150mm x 77mm section, which holds its strength and straightness along the full 5.8m length. The beam is lighter than equivalent sawn timber of the same size, and its edges are chamfered for easier handling. A water repellent paint finish protects the timber through repeated site use.

Formwork carpenters and concreters use this LVL beam on residential and commercial concrete pours across New Zealand, from slab bearers and joists to soldiers and walers on vertical wall forms.

Read more

Key Specs

  • Length: 5.8m
  • Depth: 150mm
  • Width: 77mm
  • Material: Laminated Veneer Lumber (LVL)
See All Specifications
In Stock

Need a quote? Simply add to cart and you have the option to request a quote before checkout

Categories: ,

What is Formwork LVL 150 x 77?

LVL Formwork Timber 150mm x 77mm x 5.8m is a structural laminated veneer lumber beam built for bearers, joists, walers, and soldiers in concrete formwork. Standard sawn timber can bow or twist along its length, and strength can vary from one length to the next, which shows up as an uneven concrete finish once the formwork comes off.

Laminated veneer construction solves this. Thin timber veneers are bonded into a single 150mm x 77mm section, which holds its strength and straightness along the full 5.8m length. The beam is lighter than equivalent sawn timber of the same size, and its edges are chamfered for easier handling. A water repellent paint finish protects the timber through repeated site use.

Formwork carpenters and concreters use this LVL beam on residential and commercial concrete pours across New Zealand, from slab bearers and joists to soldiers and walers on vertical wall forms.

Benefits

  • Holds consistent strength and straightness across the full 5.8m length, unlike sawn timber of the same size.
  • Reduces forming costs by cutting rework caused by bowed or twisted bearers and joists.
  • Lighter than equivalent sawn timber, easier to lift, carry, and position on site.
  • Chamfered edges reduce splinters and make the beam easier to handle during formwork strike.
  • Water repellent paint finish protects the beam through repeated pours and site storage.
  • Manufactured to meet AS/NZS 4357 structural LVL requirements.
  • One uniform beam size suits bearers, joists, walers, and soldiers.

Main Applications

  • Bearers and joists supporting suspended concrete slab formwork.
  • Walers bracing vertical wall and column formwork panels.
  • Soldiers providing upright support along formwork edges.
  • General structural support wherever a straight, uniform LVL section is needed on site.
  • Residential and commercial concrete construction across New Zealand.

Technical Specifications

Specification Details
Length 5.8 m
Depth 150 mm
Width 77 mm
Material Laminated Veneer Lumber (LVL)
Edge Treatment Chamfered
Finish Water repellent paint

Resources

Download your Formwork LVL 150 x 77 resources:

  • Safety Data Sheet

    Formwork LVL 150 x 77 does not have any Safety Data Sheets. Request here

PowerPac Expert

Need an Expert?

We're here to help you with any questions you have on Formwork LVL 150 x 77.

Frequently Asked Questions

About Formwork LVL 150 x 77

How to install

Formwork LVL 150 x 77

  1. Inspect each beam before use. Check for splits, delamination, or damage to the painted finish before incorporating it into the formwork.
  2. Position bearers and joists to the spacing set out in the formwork design or engineer's drawings for the slab or wall being poured.
  3. Set soldiers and walers vertically along formwork panel edges to brace the panels against the pressure of wet concrete.
  4. Fix each LVL beam using the connection method specified in the formwork design, so it cannot shift once concrete is placed.
  5. Check level and alignment before pouring. Adjust bearers and joists so the formwork surface is true before concrete placement begins.
  6. Strip formwork carefully after the concrete has cured to the required strength, easing beams free rather than levering directly against the LVL section.
  7. Clean and inspect each beam after strike. Store it away from ground moisture so the beam can be reused on the next pour.

We suggest following the steps above for the best installation results. If you have any questions or need assistance, our team is here to help.

Need more information? Our team is ready to answer any questions Get Help
Join our newsletter and get 20% discount
Promotion nulla vitae elit libero a pharetra augue