SKU: BC-150A
The Boscaro Column Concrete Skip 1500L with Release Cord is a crane lifted concrete skip with a 1.5 m3 (1500 litre) capacity. Concreters fill it with wet concrete, lift it by crane to the pour and open the gate with the release cord to place concrete into columns, walls and other narrow forms.
A column skip has a tall, narrow shape and a bottom outlet that suits tight formwork. The 1500 litre size sits between the 1 m3 and 2 m3 column skips that Powerpac also lists. Powerpac has not published the skip weight, the safe working load or the outlet size for this item, so confirm these details before lifting.
Concreters and crane operators use this 1500 L Boscaro column skip to lift concrete to the pour.
Need a quote? Simply add to cart and you have the option to request a quote before checkout
The Boscaro Column Concrete Skip 1500L with Release Cord is a crane lifted concrete skip with a 1.5 m3 (1500 litre) capacity. Concreters fill it with wet concrete, lift it by crane to the pour and open the gate with the release cord to place concrete into columns, walls and other narrow forms.
A column skip has a tall, narrow shape and a bottom outlet that suits tight formwork. The 1500 litre size sits between the 1 m3 and 2 m3 column skips that Powerpac also lists. Powerpac has not published the skip weight, the safe working load or the outlet size for this item, so confirm these details before lifting.
Concreters and crane operators use this 1500 L Boscaro column skip to lift concrete to the pour.
| Specification | Details |
|---|---|
| Capacity | 1500 L |
Download your Boscaro Column Concrete Skip 1500L cap. with Release Cord resources:
Boscaro Column Concrete Skip 1500L cap. with Release Cord does not have any Safety Data Sheets. Request here
About Boscaro Column Concrete Skip 1500L cap. with Release Cord
The skip has a capacity of 1500 litres, which is 1.5 cubic metres.
A column skip places concrete into columns, walls and other narrow forms. Its tall, narrow body fits tight formwork.
The operator pulls the release cord to open the gate and discharge the concrete.
Powerpac has not published the safe working load. Confirm it with Powerpac before lifting a full skip.